Figure 1From: Managing daily surgery schedules in a teaching hospital: a mixed-integer optimization approach Scheduling of a given surgical day. Where (1–7) are the surgeries performed in three ORs with two surgeons. And (a) is the OR idle time, (b) is the over time, and (c) is the waiting time of the surgeons.Back to article page