Site-specific model estimates | |||||
---|---|---|---|---|---|
ED | Parameter | Estimate (log-odds) | Odds ratio | 95% CI | P-value |
1a | |||||
 |  Pre-intervention slope | 0.267 | 1.31 | [1.21, 1.41] | < 0.001 |
 |  Change in slope | −0.197 | 0.82 | [0.64, 1.06] | 0.124 |
 |  Intervention slope | 0.069 | 1.07 | [0.84, 1.36] | 0.572 |
 |  Change in intercept | 0.004 | 1.00 | [0.75, 1.34] | 0.977 |
2 | |||||
 |  Pre-intervention slope | 0.172 | 1.19 | [1.12, 1.25] | < 0.001 |
 |  Change in slope | −0.001 | 1.00 | [0.86, 1.16] | 0.992 |
 |  Intervention slope | 0.171 | 1.19 | [1.04, 1.36] | 0.013 |
 |  Change in intercept | −0.175 | 0.84 | [0.70, 1.00] | 0.054 |
3a | |||||
 |  Pre-intervention slope | 0.346 | 1.41 | [1.31, 1.52] | < 0.001 |
 |  Change in slope | −0.080 | 0.92 | [0.78, 1.09] | 0.353 |
 |  Intervention slope | 0.266 | 1.30 | [1.12, 1.52] | < 0.001 |
 |  Change in intercept | −0.137 | 0.87 | [0.70, 1.09] | 0.231 |
4a | |||||
 |  Pre-intervention slope | 0.112 | 1.12 | [1.01, 1.24] | 0.028 |
 |  Change in slope | 0.273 | 1.31 | [1.12, 1.54] | < 0.001 |
 |  Intervention slope | 0.385 | 1.47 | [1.30, 1.66] | < 0.001 |
 |  Change in intercept | 0.115 | 1.12 | [0.90, 1.41] | 0.316 |
5 | |||||
 |  Pre-intervention slope | −0.070 | 0.93 | [0.89, 0.98] | 0.003 |
 |  Change in slope | 0.139 | 1.15 | [1.02, 1.29] | 0.020 |
 |  Intervention slope | 0.068 | 1.07 | [0.96, 1.19] | 0.210 |
 |  Change in intercept | 0.191 | 1.21 | [1.05, 1.40] | 0.009 |
6a | |||||
 |  Pre-intervention slope | 0.219 | 1.25 | [1.12, 1.39] | < 0.001 |
 |  Change in slope | −0.209 | 0.81 | [0.60, 1.10] | 0.179 |
 |  Intervention slope | 0.011 | 1.01 | [0.76, 1.34] | 0.940 |
 |  Change in intercept | 0.208 | 1.23 | [0.85, 1.79] | 0.274 |
7a | |||||
 |  Pre-intervention slope | 0.244 | 1.28 | [1.12, 1.46] | < 0.001 |
 |  Change in slope | 0.042 | 1.04 | [0.86, 1.26] | 0.658 |
 |  Intervention slope | 0.286 | 1.33 | [1.17, 1.52] | < 0.001 |
 |  Change in intercept | − 0.033 | 0.97 | [0.73, 1.27] | 0.816 |
8a | |||||
 |  Pre-intervention slope | −0.054 | 0.95 | [0.72, 1.25] | 0.701 |
 |  Change in slope | 0.302 | 1.35 | [0.95, 1.92] | 0.093 |
 |  Intervention slope | 0.248 | 1.28 | [1.02, 1.60] | 0.029 |
 |  Change in intercept | −0.024 | 0.98 | [0.73, 1.31] | 0.875 |