Fig. 2From: Building a patient-centered and interprofessional training program with patients, students and care professionals: study protocol of a participatory design and evaluation studyQuality improvement plan in PDSA cycles. Legend: Schematic of the quality improvement plan in the PDSA-cycles of the program. Left-top box shows the methods for process and effect evaluation and time-points in the PDSA-cycle when the research methods are applied. The quality improvement steps in the PDSA-cycles, that is planning the structure and content of the program, performing process and effect evaluation, discussing the evaluation with the research team and advisory board, and adapting the structure and content of the program, are shown at the bottom of the figureBack to article page